Location of performance / Site: | Irsching, Vohburg an der Donau, Bavaria, Germany, Europe |
---|---|
Period: | Since Sep 2018 |
Responsible company location: | BAUER Resources GmbH, Bereich Bauer Umwelt, Standort Edelshausen, Schrobenhausen |
Treatment methods: | Activated carbon filtration, Gravel / Sand filtration |
---|---|
Pollutants: | Capstone products A and B (CDPOS and DPOSA), PAH, Perfluorinated alkyl substances (PFAS), Perfluorooctane sulfonic acid (PFOS) |
Other technical conditions: | Automatic filter backwash, Control technology with remote access, Data storage, Data storage online |
Volume flow: | 150 m³/h |